GT Industrial IIIGia Thuỳ2026-09-24T19:01:52+07:00 GT Industrial III Investor: Gia Thuy Co., Ltd. Scope: Legal, Design, Procurement and Build (Construction, Infrastructure and MEP). Total land area: 20,000 m². Total building area: 12,000 m².
Hirochiku Asia VietnamGia Thuỳ2026-09-24T18:51:12+07:00 Hirochiku Asia Vietnam AREA: 20,000 m². CONTRACT PACKAGE: Legal, Design and Build (Civil, Structure and MEP). LOCATION: Phu My 3 Industrial Park, Ba Ria – Vung Tau Province.
KIMYIDA PROJECTGia Thuỳ2026-09-24T15:05:58+07:00 KIMYIDA PROJECT LOCATION: Nhon Trach 3 – Phase 2 Industrial Park, Dong Nai Province. AREA: 14,785 m². CONTRACT PACKAGE: Legal, Design and Build (Civil, Structure and MEP).
SEV PROJECTGia Thuỳ2026-09-24T14:57:44+07:00 SEV PROJECT LOCATION: Bien Hoa 2 IP, Dong Nai City. AREA: 22,000 m2. CONTRACT PACKAGE: Legal, Design and Build (Civil, Structure and MEP).
VIET PHU Fiber FactoryDEV2025-10-01T10:30:03+07:00 VIET PHU Fiber Factory INVESTOR: Viet Phu Fiber Joint Stock Company. LOCATION: Lot F7 - F12, Road D2, Cau Tram Industrial Park, Cau Tram Hamlet, Long Trach Commune, Can Duoc District, Long An Province. AREA: 31,307 m2. CONTRACT PACKAGE: Design and construction of factory, infrastructure construction, steel truss construction...
DP FactoryDEV2025-10-01T10:27:45+07:00 DP Factory LOCATION: No. 2 VSIP II-A, Road 11, VSIP II-A Industrial Park, Tan Uyen, Binh Duong, Vietnam. AREA: 11,500 m2. CONTRACT PACKAGE: Legal, Design and Construction (Structure, Finishing and Electromechanical Installation).
LOGOS-SAO DAU WAREHOUSEDEV2025-10-01T10:25:15+07:00 LOGOS-SAO DAU WAREHOUSE LOCATION: Dau Giay Industrial Park, Thong Nhat District, Dong Nai Province. AREA: 51,840 m2. CONTRACT PACKAGE: Construction of factory, office area, canteen.
Atago VIETNAM Garment FactoryDEV2025-10-01T10:18:43+07:00 Atago VIETNAM Garment Factory INVESTOR: Atago Vietnam Garment Company Limited. LOCATION: Lot A_6C2_CN, N4B Street, Bau Bang Industrial Park, Bau Bang Ward, Binh Duong Province. AREA: 16,587m2. CONSTRUCTION TIME: 7 months.
SOLTEC HANOI FactoryDEV2025-10-01T10:16:25+07:00 SOLTEC HANOI Factory LOCATION: Dong Van II Industrial Park, Duy Tien District, Ha Nam Province. AREA: 19,096 m2. CONTRACT PACKAGE: Factory construction.
GT Industrial IIDEV2025-10-01T11:46:14+07:00 GT Industrial II INVESTOR: Gia Thuy Company Limited. LOCATION: Nhon Trach 3 Industrial Park, Dong Nai Province. AREA: 36,300m2. CONTRACT PACKAGE: Legal, Design, Supply and Construction (Infrastructure and electromechanical construction).
LIPOVITAN FactoryDEV2025-10-01T07:38:25+07:00 LIPOVITAN Factory INVESTOR: TAISHO Vietnam Co., Ltd. LOCATION: Dien Khanh District, Khanh Hoa Province. PROJECT: Factory renovation. AREA: 33,673 m2. CONTRACT PACKAGE: Design and construction of exterior works and mechanical and electrical works.
MEDLOG DEPOT Song Than 3DEV2025-09-30T15:38:01+07:00 MEDLOG DEPOT Song Than 3 LOCATION: Song Than 3 Industrial Park, Binh Duong Province. AREA: 23,860 m2. CONTRACT PACKAGE: Legal, Design and Construction (Structure, finishing and M&E installation).